1.   首頁  
  2. |
  3.   產品專區  
  4. |
  5.   加值服務  
  6. |
  7.   客戶服務  
  8. |
  9.   企業專區  
  10. |
  11.   網路商城  
 
跨平台產品
Dr.eye PLUS
Dr.eye Quiz
 
家用産品
Dr.eye 365
Dr.eye 譯典通 X
Dr.eye 譯典通 X 升級版
 
行動産品
Dr.eye 雲端免費版
Dr.eye 雲端版 - 日語通
Dr.eye 雲端版 - 韓語通
Dr.eye Mobile for Android
Dr.eye Mobile for iPhone
 
硬體産品
Dr.eye 翻譯小子 X
Dr.eye 翻譯小子 3
 
過往產品
Dr.eye 譯典通 9.0 旗艦版
Dr.eye 譯典通 9.0 旗艦升級版
Dr.eye 譯典通 9.0 全民版
 
 

Taipei-Keelung LRT line upgraded, THSR to be extended to Yilan


台北至基隆輕軌線升級,台灣高鐵延伸至宜蘭


Mayors of Taipei, New Taipei, Keelung agree to link up cities with more robust light rail rapid transit system


TAIPEI (Taiwan News) — Three Taiwanese mayors and the transportation minister on Tuesday (Oct. 13) announced that they will be upgrading the Taipei-Keelung LRT line and push for the extension of the Taiwan High Speed Rail (THSR) to Yilan, among other major changes to expand the transportation network in Greater Taipei.

In an unprecedented gathering on Tuesday, Minister of Transportation and Communications Lin Chia-lung (林佳龍) met with Taipei Mayor Ko Wen-je (柯文哲), New Taipei City Mayor Hou You-yi (侯友宜), and Keelung Mayor Lin Yu-chang (林右昌) to discuss plans for developing new rail corridors to better link the three cities together.

The four leaders announced during a press conference that they had reached the following five preliminary agreements:

1. Upgrade of Keelung LRT to LRRT

The planned light rail system for Keelung will be upgraded to a light rail rapid transit (LRRT) system to enable it to carry a higher passenger volume and that it will be enabled with automatic train operation (ATO). The more robust LRRT system will be able to carry 10,000 to 15,000 passenger trips per hour, a far cry from the 5,000 targeted with the original light rail trains.

2. Terminal in Taipei will be underground at Nangang

The terminus of the Taipei-Keelung LRRT at the Nangang Exhibition Hall MRT Station will be underground in order to facilitate the transfer of passengers to THSR and Taiwan Railways Administration (TRA) trains at the Nangang Railway Station.

3. Minsheng-Xizhi Line to be integrated with Keelung MRT

As the future Minsheng-Xizhi and Keelung LRRT lines are parallel to Datong Road from Zhangshuwan to Xike, the two lines will share the same tracks in that section to streamline construction and facilitate the transfer of passengers.

4. Keelung LRRT endpoint

The new light rail line will run from Nangang to TRA's Badu Station, in Keelung's Nuannuan District. As for additional stops in Keelung after Badu, different options are being evaluated and planning and discussions will continue.

5. Extension of THSR to Yilan

The leaders also agreed to extend THSR from Nangang to Yilan in order to reduce congestion on National Freeway Five and crowding on the TRA trains. They emphasized that the new route would avoid the watershed of the Feitsui Reservoir.
 
Keoni Everington, Taiwan News, Staff Writer  
2020-10-14  

聯絡我們

客服專線 : (02)77378801
客服信箱 : service@dreye.com
服務時間 : 週一至週五 09:00~11:40 12:40~17:00 國定假日休息
購買鏈接
PC
Mobile
加入粉絲團


2017 Inventec Besta Co.,Ltd. All rights reserved
無敵科技股份有限公司版權所有
   隱私權聲明