1.   首頁  
  2. |
  3.   產品專區  
  4. |
  5.   加值服務  
  6. |
  7.   客戶服務  
  8. |
  9.   企業專區  
  10. |
  11.   網路商城  
 
跨平台產品
Dr.eye PLUS
Dr.eye Quiz
 
家用産品
Dr.eye 365
Dr.eye 譯典通 X
Dr.eye 譯典通 X 升級版
 
行動産品
Dr.eye 雲端免費版
Dr.eye 雲端版 - 日語通
Dr.eye 雲端版 - 韓語通
Dr.eye Mobile for Android
Dr.eye Mobile for iPhone
 
硬體産品
Dr.eye 翻譯小子 X
Dr.eye 翻譯小子 3
 
過往產品
Dr.eye 譯典通 9.0 旗艦版
Dr.eye 譯典通 9.0 旗艦升級版
Dr.eye 譯典通 9.0 全民版
 
 

Mountain-Moon Bridge in Taiwan’s Taroko Gorge to open on trial basis


台灣太魯閣峽谷的山月吊橋開放試營運


Reconstructed suspension bridge free to visit during trial period starting Aug. 12


TAIPEI (Taiwan News) — The newly rebuilt Mountain-Moon Bridge (山月吊橋) at Taroko Gorge is scheduled to open on a trial basis on the afternoon of Aug. 12 and requires visitors to register online beforehand.

Taroko National Park Headquarters Deputy Director Chen Chien-lung (陳乾隆) said that during the trial period, visitors will be distributed into four groups — two in the morning and two in the afternoon — with each group consisting of a maximum of 200 people, per CNA. The headquarters will open online registration on its website on Aug. 7, according to Chen.

The deputy director said that the bridge will be free of charge during this period, with the staff assessing the overall operation of the Buluowan terraces, including the bridge and Mountain Moon (Shanyue) Village, and the number of visitors to provide insight into how much to charge for admission in the future. Chen added that the headquarters will be outsourcing the management of the site to private companies and that further developments to be announced before the end of this year, according to the report.

First built in 1914 during the Japanese colonial period, Mountain-Moon Bridge was once the longest suspension bridge in Taroko Gorge. However, the bridge was demolished in 1940-41 when the construction of a gold mining road damaged its foundations.

The reconstruction work on Mountain-Moon Bridge, which straddles the Liwu River and connects the Zhuilu and Badagan area with the Buluowan terraces, began in August 2016 and was completed in May 2019. The 196-meter suspension bridge was a challenging construction project, as it stretches 150 m above the riverbed with steep slopes on both sides.
 
George Liao, Taiwan News, Staff Writer  
2020-07-29  

聯絡我們

客服專線 : (02)77378801
客服信箱 : service@dreye.com
服務時間 : 週一至週五 09:00~11:40 12:40~17:00 國定假日休息
購買鏈接
PC
Mobile
加入粉絲團


2017 Inventec Besta Co.,Ltd. All rights reserved
無敵科技股份有限公司版權所有
   隱私權聲明